Manage the 7F rotor wave to ensure your generation assets are available when needed
A large number of 7F gas turbines were installed during the boom years of 1999 to 2004. Now, nominally 25 years later, the industry is facing a “7F rotor wave” with many turbine rotors nearing “end-of-life” (EOL, 5000 factored fired starts or 144,000 factored fired hours) and coming due for an exchange, replacement, or lifetime […]
Manage the 7F rotor wave to ensure your generation assets are available when needed Read More »